Construction Blog – 85 Everett

[ssba]

Some images from just on the other side of demo and into framing. Pictures curtesy of David Lank, the one and only.

Skipped a lot of the construction on this one. We have 85% of the exterior done. Just some door and canopy updates with some flower boxes and lights up above. The black window frames, although a slight premium, I think were a good decision.